Maryland Acoustic Monitoring Study
April 2024 Cruise Plan | 4/22 - 4/24
R/V Daiber |
Lewes, DE700 Pilottown Rd, Lewes, DE, 19958 |
Crew
- Caroline Tribble UMCES
- Mike O’Brien UMCES
- Derek Jaskula Cornell
- Fred Channell Cornell
- Jon Swallow UD
- Evan Falgowski UD, Captain of R/V Daiber
Contact Information
- (301) 938-0265 | ctribble@umces.edu
- (267) 970-1973 | mobrien@umces.edu
- (716) 381-2770 | djj63@cornell.edu
- (607) 368-3609 | frc29@cornell.edu
- (302) 396-8565 | jswallow@udel.edu
- (610) 563-1040 | evanfal@udel.edu
Schedule
21 April
- Cornell team departs for Lewes, DE (Channell, Jaskula)
- 700 Pilottown Rd, Lewes, DE, 19958
22 April
Lewes, DE 0800 – Cornell team arrives at R/V Daiber to load equipment, obtain satellite connection with instruments, etc. (Channell, Jaskula, Falgowski)
Solomons, MD 0800 - 01000 UMCES team pack CBL truck (2017 Silverado) at Solomons, MD. Drive to Lewes, DE (Tribble, O’Brien)
1000 - 1230 UMCES team depart for Lewes, DE (Tribble, O’Brien)
1400 - UMCES team arrives at R/V Daiber to load and prep equipment (Tribble, O’Brien, Falgowski)
- 700 Pilottown Rd, Lewes, DE, 19958
Overnight in Rehoboth, DE
23 April
Full crew (Channell, Jaskula, Tribble, O’Brien, Falgowski)
0630 - Depart University of Delaware dock
Recover all instruments and redeploy some* across stations:
- T-3M, T-3C, T-1M, T-2M, T-2C, A-7M, D2, A-6M, D1, V4*, A-5M, A-5C*, A-3M
1700 - Return to dock
Overnight in Rehoboth, DE
24 April
Full crew (Channell, Jaskula, Tribble, O’Brien, Falgowski)
0630 - Depart University of Delaware dock
Recover all instruments and redeploy some* across stations:
- A-1M, A-4M, A-2M, T-1C*, V5*
1425 - Return to dock
Depart from Lewes, DE following return
Station Map
In the map above, stations T-1M* and T-1C* represent station true coordinates following BOEM project array. Stations with no * in name represent current deployed coordinates of devices in array.
Static Station Map
Station Coordinates
Deployment Adjustments for Recovery & Hot-Swapping
Recovery only for all Cornell Rockhopper sites and UMCES sites T-2C, T-3C
Addition of VR2ARs in place of VR2Ws and Sonardyne acoustic releases for redeployed UMCES sites
- UMCES sites to be redeployed: T-1C, V5, A-5C, V4
Removal of co-deployed C-POD and LS-1X at sites T-1C and A-5C; VR2Ws replaced by VR2ARs
- Addition of Soundtrap at T-1C
Addition of an F-POD at site V5 and an LS-1X at site V4
Mooring configurations:
LS-1X and F-POD placement above VR2ARs (necessary for acoustic release mechanism)
F-POD and Soundtrap placement above VR2AR (modeling similar design used by WHOI shown below)
Estimated max. time needed at stations:
Rockhoppers - 15 mins
- Retrieval only
UMCES multi-device moorings - 15 to 45 mins
T-2C, T-3C – 15 mins
- F-POD + VR2W + Sonardyne AR recover
D1, D2 – 15 mins
- F-POD + Sonardyne AR recover
V4, V5 – 15 mins
VR2AR recover
VR2AR + LS-1X or F-POD redeploy
T-1C, A-5C – 45 mins
F-POD + C-POD + LS-1X + VR2W + Sonardyne AR recover
F-POD + Soundtrap + VR2AR redeploy
Day 1 - Tuesday, 23 April 2024
Goals: Recover 5 Rockhoppers, 2 solo F-PODs, 1 VR2AR, and 2 F-POD/VR2W moorings. Redeploy 1 F-POD/VR2AR and 1 LS-1X/VR2AR mooring.
Time |
From |
To |
Transit Distance/Activity |
|---|---|---|---|
| 0600-0845 | Lewes | T-3M | Transit 46.5 km |
| 0845-0900 | T-3M | Recover Rockhopper | |
| 0900-0905 | T-3M | T-3C | Transit 1.36 km |
| 0905-0920 | T-3C | Recover F-POD, VR2W | |
| 0920-0931 | T-3C | T-1M | Transit 2.76 km |
| 0931-0946 | T-1M | Recover Rockhopper | |
| 0946-1006 | T-1M | T-2M | Transit 2.47 km |
| 1006-1021 | T-2M | Recover Rockhopper | |
| 1021-1029 | T-2M | T-2C | Transit 1.97 km |
| 1029-1044 | T-2C | Recover F-POD, VR2W | |
| 1044-1113 | T-2C | A-7M | Transit 7.3 km |
| 1113-1128 | A-7M | Recover Rockhopper | |
| 1128-1136 | A-7M | D2 | Transit 1.99 km |
| 1136-1151 | D2 | Recover F-POD | |
| 1151-1200 | D2 | A-6M | Transit 2.3 km |
| 1200-1215 | A-6M | Recover Rockhopper | |
| 1215-1222 | A-6M | D1 | Transit 1.75 km |
| 1222-1237 | D1 | Recover F-POD | |
| 1237-1247 | D1 | V4 | Transit 2.43 km |
| 1247-1302 | V4 | Recover VR2AR / redeploy VR2AR + LS-1X | |
| 1302-1311 | V4 | A-5M | Transit 2.16 km |
| 1311-1326 | A-5M | Recover Rockhopper | |
| 1326-1328 | A-5M | A-5C | Transit 0.5 km |
| 1328-1413 | A-5C | Recover F-POD, C-POD, VR2W, LS-1X / Redeploy F-POD + VR2AR |
|
| 1413-1443 | A-5C | A-3M | Transit 23.96 km |
| 1443-1500 | A-3M | Recover Rockhopper | |
| 1500-1700 | A-3M | Lewes | Transit to return to dock |
Times assume a transit speed of 15 knots (27.78 km/hour).
Day 2 - Wednesday, 24 April 2024
Goals: Recover 3 Rockhoppers, 1 VR2AR, and 1 F-POD/C-POD/LS-1X/VR2W mooring. Redeploy 1 F-POD/VR2AR and 1 F-POD/Soundtrap/VR2AR mooring.
Time |
From |
To |
Transit Distance/Activity |
|---|---|---|---|
| 0600-0800 | Lewes | A-1M | Transit 29.2 km |
| 0800-0815 | A-1M | Recover Rockhopper | |
| 0815-0833 | A-1M | A-4M | Transit 4.53 km |
| 0833-0848 | A-4M | Recover Rockhopper | |
| 0848-0905 | A-4M | A-2M | Transit 4.27 km |
| 0905-0920 | A-2M | Recover Rockhopper | |
| 0920-0949 | A-2M | T-1C | Transit 7.26 km |
| 0949-1034 | T-1C | Recover F-POD, C-POD, VR2W, LS-1X / Redeploy F-POD + Soundtrap + VR2AR at (38.336, -74.949) |
|
| 1034-1108 | T-1C | V5 | Transit 8.58 km |
| 1108-1123 | V5 | Recover VR2AR / redeploy VR2AR + F-POD | |
| 1123-1333 | V5 | Lewes | Transit to return to dock |
Times assume a transit speed of 15 knots (27.78 km/hour).
Retrieval Summary Table
Deployment Summary Table
UMCES Packing list
🔲 4 VR2ARs
🔲 4 80 lb weights (all sacrificial)
🔲 3 F-PODS
🔲 1 LS-1X (48 kHz sampling rate; duty cycle 5 minutes on and 10 minutes off)
🔲 1 Soundtrap (48 kHz sampling rate; duty cycle 5 minutes on and 10 minutes off)
🔲 4 large subsurface buoys, float line attached with eyelets
🔲 2 extra buoys, no float line or eyelets attached
🔲 Extra float line
🔲 Zip Ties - large, medium, and small sizes
🔲 45 batteries for F-PODs and LS-1X
🔲 Sharpies
🔲 Desiccant packets
🔲 F-POD opening rods
🔲 Toolbox
🔲 Deckbox
🔲 Transducer loop
🔲 Acoustic release transmitter
🔲 Gloves
🔲 F-POD memory cards
🔲 F-POD battery springs (extra)
🔲 Big shackles
🔲 Medium shackles
🔲 Thimbles
🔲 6 gallon buckets for feeding in ground lines during recovery
🔲 Grappling hook and chain
🔲 UMCES first aid kit